Breakdown of the 21 HHSRS 2 Health & Safety Hazards

Here is some information to help you understand more about HHSRS Risk Assessment hazards.

GROUP 1: PROTECTION AGAINST ACCIDENTS

Hazard 1: Falls on the Level

Deficiencies & Diagnostic Indicators

  • Sudden level changes between internal rooms, threshold transitions, or floor finish lips greater than 6mm.
  • Deteriorated, unstable, or damaged subfloor surfaces including cracked ceramic tiles, buckled timber planks, torn vinyl sheet bonds, or loose laminate profiles.
  • Loose, un-tensioned, or worn internal carpets displaying heavy surface rippling, bunching, or frayed seam matrices.
  • Absence of adequate peripheral wall socket configurations forcing live appliance extension cords to track directly across primary footpaths.
  • Sub-optimal friction interfaces on internal flooring paths prone to moisture deposition, including slick un-textured natural stones or smooth sheet vinyl coatings.
  • External approach path matrix failures including frost-shattered paving, missing jointing compound, or incorrect fall slopes causing stagnant surface pooling.
  • Heavy external biological surface matrices including established moss patches, localized micro-algae films, mud build-up, or un-cleared leaf damp sheets.
  • Circulation space constraints including structural fixtures obstructing narrow pathways, unexpected floor projections, or deep localized shadows caused by missing luminaires.
  • Presence of low-level un-tempered or non-safety glass panes positioned directly alongside active pedestrian walkways.

Remedial Safety Actions

  • Plane down structural thresholds or install graduated transition bars to ensure structural level gaps drop below 6mm.
  • Lift defective materials and replace with code-compliant level finishes; re-tension floating carpets and renew peripheral grippers.
  • Install supplementary double flush-mounted power sockets to isolate and clear trailing wires away from pedestrian routes.
  • Apply chemical slip-resistant finishes or high-friction polymer overlays to high-risk tiled zones.
  • Re-lay external paving elements to create distinct, functioning drainage falls; pressure wash and apply chemical biocides to eliminate moss and algae.
  • Remove sharp structural features, encase lower radiator configurations, and swap out non-safety glass panes for toughened safety glass alternatives.

Hazard 2: Falling on Stairs, Steps & Slopes

Deficiencies & Diagnostic Indicators

  • Geometric irregularity faults including distinct dimensional variations in sequential vertical riser heights or horizontal tread depths.
  • Excessive structural pitch parameters breaching 42 degrees, or individual step configurations lacking sufficient placement depth.
  • Open-riser step configurations lacking solid vertical backing plates, or displaying dimensional gaps that permit single-axis object passage.
  • Complete omission or structural displacement of continuous, easy-to-grip handrails across flights displaying 4 or more risers.
  • Handrail height orientation non-compliance where the primary support rail sits outside the vertical window of 900mm to 1000mm.
  • Open staircase perimeter boundaries lacking structurally stable balustrades, or featuring vertical baluster spacing gaps wider than 100mm.
  • Horizontal climbing frame balustrade designs that create an easy foothold trap for infant occupants.
  • Deteriorated, un-pinned, or loose stair carpets, missing nosing strips, or loose tread boards prone to pivoting under load.
  • Visual track distortion fields caused by unshielded luminaire glare blinding descending lines of sight or casting deep shadows.

Remedial Safety Actions

  • Reconstruct underlying timber or concrete step frameworks to establish strict dimensional uniformity across the flight.
  • Install mechanical high-visibility, slip-resistant step nosing strips to define step edge horizons.
  • Retrofit durable matching timber or composite closure panels to seal open-riser gaps.
  • Mount continuous handrails anchored directly into structural load-bearing masonry walls using heavy-gauge fixings at a standard 950mm high.
  • Erect code-compliant vertical timber or metal guard balusters to seal open flight sides down to below 100mm spacings.
  • Relocate luminaire junction points or apply diffusing covers to evenly distribute light down step faces without direct eye glare.

Hazard 3: Falling Between Levels

Deficiencies & Diagnostic Indicators

  • Sub-standard internal window sill elevations sitting lower than 800mm from finished floor levels on upper floor elevations.
  • Complete lack of operational, key-lockable safety restrictor hooks on high windows, allowing unrestricted outward travel.
  • Structural decay, wood rot, metal corrosion, or structural looseness within external balcony balustrades, parapets, or roof railings.
  • Vertical gaps within safety barriers or protective parapet enclosures that exceed the critical 100mm spacing threshold.
  • Placement of climbing anchors such as space heating radiators, fixed pipework runs, or built-in furniture items beneath low-silled windows.
  • Uncovered, un-guarded, or fragile subterranean basement lightwells or cellar steps lacking perimeter floor barriers.

Remedial Safety Actions

  • Retrofit heavy-duty, key-lockable restrictor stays to windows to mechanically limit outward window sash travel to under 100mm.
  • Construct internal structural guardrails to a minimum height of 1100mm over low-silled window voids.
  • Cut out decayed timber or rusted metal balcony sections; install code-compliant safety screens without climbable rails.
  • Reposition loose internal room layouts to relocate furniture structures away from window zones.
  • Install fixed metal mesh grids or continuous perimeter balustrades over exposed floor openings and lightwells.

Hazard 4: Fire and Explosions

Deficiencies & Diagnostic Indicators

  • Complete absence of dedicated detection infrastructure or reliance on isolated, standalone battery-operated sensors.
  • Lack of mains-powered, wirelessly interlinked heat and smoke detector loops across high-risk zones and circulation pathways.
  • Containment failures including standard thin hollow-core timber doors separating kitchens or utility rooms from escape routes.
  • Missing, non-functional, or painted-over automatic self-closing hinges and intumescent cold-smoke brush seals on fire doors.
  • Physical blockages along escape pathways, or doors fitted with complex key-locked deadbolts along primary emergency exit tracks.
  • First-floor escape windows locked solid, painted shut, or displaying open dimensions too tight for emergency passenger egress.
  • Ignition source hazards including old, uncertified gas installations, damaged electrical wiring, or cooking hobs set next to soft furnishings.
  • Structural collapse vectors resulting from fire exposure due to unprotected steel joists or missing fire-rated plasterboard linings.

Remedial Safety Actions

  • Install a comprehensive mains-powered, wirelessly interlinked smoke and heat detection system.
  • Upgrade standard internal doors along escape routes to certified FD30 fire-resistant door assemblies equipped with self-closers.
  • Fit perimeter intumescent strips and smoke seals into fire door frame recesses.
  • Remove key-operated locks along egress paths and swap with internal thumb-turn mechanism deadbolts.
  • Overhaul windows along escape routes to guarantee clear opening zones meet exit guidelines.
  • Isolate cooking hobs from combustible vertical surfaces; line structural steel components with double-layer fire-rated boards.

Hazard 5: Flames, Hot Surfaces, etc.

Deficiencies & Diagnostic Indicators

  • Thermal water storage spikes where domestic tap outputs deliver water exceeding a safe 60 degrees.
  • Absence of local thermostatic balance control valves on showers, bathtubs, or high-pressure basin mixers.
  • Exposed high-temperature heating components, bare system pipework runs, or open flame hearths lacking structural guards.
  • Kitchen layout congestion faults where cooking stoves or hobs are situated immediately adjacent to internal doorways.

Remedial Safety Actions

  • Lower boiler control modules and thermal cylinder stats to cap tap feed supplies at 50 degrees.
  • Integrate inline Thermostatic Mixing Valves (TMVs) directly below basin and bath tap installations to limit water delivery to 43 degrees.
  • Secure heavy-gauge metal wire guards over exposed space heaters, radiant bars, and combustion hearths.
  • Alter kitchen worktop flow paths to introduce a clear 300mm minimum safety buffer zone away from doors.

Hazard 6: Collisions, Entrapment and Ergonomics

Deficiencies & Diagnostic Indicators

  • Entrapment vectors including broken window sash cords or non-functional multi-stage friction stays that allow frames to fall under gravity.
  • Heavy structural doors lacking soft-close hinges or buffer plates that can crush fingers.
  • Collision projections including low door frames (under 1900mm) or window casements that open outward across external pathways.
  • Ergonomic strain defects including sub-standard kitchen worktop heights, or high-mounted storage forcing unstable over-reaching.
  • Inadequate clear space around major fixtures, forcing awkward bodily contortions during standard use.

Remedial Safety Actions

  • Replace frayed window sash counterweights and fit modern adjustable friction stay tracks.
  • Apply heavy-density foam protection cushions to low door lintels and accent with contrasting paint coats.
  • Re-hang outward-opening window sashes to pivot inward or slide vertically within frame lines.
  • Reconfigure work surface layouts to align all key manual interaction zones between 400mm and 1400mm floor heights.

Hazard 7: Structural Collapse and Falling Elements

Deficiencies & Diagnostic Indicators

  • External structural deflection indicators including leaning chimney stacks, bowing brickwork facades, or open stepping mortar cracks.
  • Unstable roof elements including fractured ridge tiles, loose roofing slates, rusting gutter brackets, or blown external render coats.
  • Internal overhead threats including water-logged, sagging ceiling plasterboards caused by service water leaks.
  • Timber core framing degradation where floor joists, wall plates, or rafter sets are soft due to active rot.
  • Deterioration of external boundary elements, chimney pots, or high-level decorative corbels.

Remedial Safety Actions

  • Rake back failed mortar lines and point masonry walls using structurally appropriate lime or cement mortar mixes.
  • Secure chimney pots with specialized metal brackets or strip away loose tiles and nail down new slate arrays.
  • Cut out sagging ceiling plaster sections; secure new 12.5mm plasterboard sheets fixed with zinc-plated screws to joists.
  • Treat joist ends with industrial wood preservatives; bolster weak timber runs using double flitch plates.

Hazard 8: Electrical Hazards

Deficiencies & Diagnostic Indicators

  • Exposed live electrical parts including cracked socket plates, open junction boxes, or bare wiring sheathing cores.
  • Outdated network distribution setups including consumer units with rewireable fuse holders that lack modern Residual Current Devices (RCD).
  • Wet zone installation faults where standard rocker switches or 240V plug points sit within 3 meters of a bath or shower tray.
  • Damaged external service supplies, loose meter tails, or absence of main protective earth bonding lines to incoming gas and water pipes.

Remedial Safety Actions

  • Replace cracked socket faceplates, light fittings, and pendant assemblies with impact-resistant polycarbonate gear.
  • Replace rewireable fuse boards with modern dual-tariff consumer units featuring dedicated RCBO miniature circuit breakers.
  • Remove standard toggle switches inside bathrooms and substitute with low-voltage ceiling pull-cords.
  • Establish correct earth bonding using 10mm green/yellow copper conductor links clamped to incoming utility mains.

GROUP 2: PHYSIOLOGICAL REQUIREMENTS

Hazard 9: Excess Cold

Deficiencies & Diagnostic Indicators

  • Thermal envelope breaches including uninsulated loft spaces, uninsulated solid masonry brick walls, or single-pane sash window frames.
  • Underpowered space heating systems including old, manual night storage units or small boilers unable to maintain living areas at 21 degrees.
  • Severe air filtration defects including missing window seals, rotten sash frames, or doors letting in cold drafts.
  • Fuel poverty risks where high-tariff, inefficient plug-in panel heaters form the primary space heating option.

Remedial Safety Actions

  • Lay mineral wool insulating mats across loft floor joists to establish a minimum continuous depth of 270mm.
  • Fit a gas combination boiler system or high-retention smart storage heaters to ensure stable space heating.
  • Install silicone compression profiles into window rebate lines and fix thick brush draft strips onto door tracks.
  • Mount internal or external solid wall insulation systems to slow structural heat loss.

Hazard 10: Radiation

Deficiencies & Diagnostic Indicators

  • Subterranean gas ingress routes where radon ground gas slips up through open floor slab cracks or unvented crawlspaces.
  • Stagnant subfloor air conditions caused by blocked external airbricks or solid concrete extensions cutting off cross-flows.
  • Properties situated in high-risk granite geographical formations lacking gas protection features.

Remedial Safety Actions

  • Clear dirt, debris, and blockages from all external clay airbricks to restore natural underfloor airflow.
  • Seal ground floor structural joints and perimeter lines using flexible, gas-tight radon barrier membranes.
  • Install an active radon sump extraction system with an inline pump to draw gas clear of living areas.

Hazard 11: Damp and Mould Growth

Deficiencies & Diagnostic Indicators

  • Penetrating moisture tracks from split downpipes, overflowing gutter sets, or failed lead flashings dumping rainwater onto masonry.
  • Capillary ground moisture travel where a missing or bridged damp proof course (DPC) allows water to track up internal plaster.
  • Condensation faults including bathrooms lacking mechanical extraction fans, or windows lacking functioning trickle vents.
  • Fungal spore accumulation where visible black mould colonies extend over wall or ceiling footprints beyond 5% of a single room area.

Remedial Safety Actions

  • Replace broken gutter sections and adjust bracket gradients to direct rainwater flow directly to downpipes.
  • Inject a chemical silicone damp proof layer into external brick courses to form a capillary moisture block.
  • Fit humidistat-controlled mechanical extract ventilation (dMEV) fans into kitchens and bathrooms to exhaust humid air automatically.
  • Sterilize mouldy surfaces using an approved fungicidal wash; redecorate using specialized anti-mould paint formulas.

Hazard 12: Lead

Deficiencies & Diagnostic Indicators

  • Heavy metal plumbing pipes present on the incoming communication line or within internal distribution loops.
  • Flaking, peeling, or deteriorated paint coatings containing lead additives on traditional wood paneling or sash frames.

Remedial Safety Actions

  • Replace all lead pipe runs with modern MDPE blue plastic lines from the external boundary stopcock.
  • Strip down deteriorated toxic paint layers using safe wet-shaving tools; encapsulate base wood using oil-based primers.

Hazard 13: Indoor Air Pollutants

Deficiencies & Diagnostic Indicators

  • Combustion product venting due to cracked boiler heat exchangers, blocked chimney pots, or split stove seals.
  • Absence of functional carbon monoxide detection devices near solid fuel, biomass, or gas combustion appliances.
  • Chemical trace storage hazards where solvents, volatile organic compounds (VOCs), or biocides are kept in unvented rooms.

Remedial Safety Actions

  • Run pressure integrity testing on boiler flues and install replacement balanced-flue lines through external wall tracks.
  • Mount sealed ten-year lithium battery Carbon Monoxide (CO) alarms on ceilings within 3 meters of all combustion gear.

Hazard 14: Excess Heat

Deficiencies & Diagnostic Indicators

  • Solar heat trap conditions created by massive unshaded south-facing glazing arrays lacking external solar shades or solar glass coatings.
  • Top-floor flat heat retention caused by an unventilated roof space or lack of roof insulation to block summer heat.
  • Inadequate thermal purge loops where window opening dimensions are too restrictive to dump built-up hot air.

Remedial Safety Actions

  • Apply external solar-control reflective films or tinted skins over south-facing glazing panels.
  • Fit multi-stage roof skylight windows to allow rising hot air to exhaust naturally from upper levels.

Hazard 15: Asbestos and MMF

Deficiencies & Diagnostic Indicators

  • Damaged or drilling asbestos insulating boards (AIB), pipe insulation, corrugated cement tiles, or worn artex ceilings.
  • Uncontained insulation fibers where raw Manufactured Mineral Fibres (MMF) are exposed in lofts without protective covers.

Remedial Safety Actions

  • Encapsulate sound, stable asbestos materials using specialized high-build elastomeric polymer bonding paint layers.
  • Instruct licensed asbestos specialist contractors to handle containment, stripping, or disposal of deteriorated fibers.

GROUP 3: PROTECTION AGAINST INFECTION

Hazard 16: Domestic Hygiene, Pests and Refuse

Deficiencies & Diagnostic Indicators

  • Pest intrusion paths including unsealed holes around incoming pipes, open crawlspace vents, or missing grates letting rodents in.
  • Unhygienic kitchen surfaces including cracked laminate counters, porous raw timber surfaces, or split splashback seals that trap food waste.
  • Inadequate external refuse space, lacking a flat paved zone for wheelie bins and leaving bags vulnerable to scavengers.
  • Defective internal sanitation systems, cracked washbasins, or leaking soil pipe connections that dump foul wastewater.

Remedial Safety Actions

  • Pack structural entry points with dense stainless steel mesh wool and seal with expanding foam.
  • Replace cracked worktops with non-porous food-grade laminate or resin; run clean anti-fungal silicone beads along all joints.
  • Construct a dedicated concrete pad or fenced area outside for secure wheelie bin storage.
  • Overhaul failed wastewater plumbing runs; replace cracked waste traps and line connections securely.

Hazard 17: Water Supply

Deficiencies & Diagnostic Indicators

  • Contamination risks in loft storage cisterns that lack close-fitting lids or insulation, letting in dust and debris.
  • Legionella stagnation hazards inside redundant pipe lengths (dead-legs) or cold lines run directly next to uninsulated hot water lines.
  • Low supply pressure or delivery drops caused by scaled, damaged, or poorly maintained private water infrastructure.

Remedial Safety Actions

  • Fit tightly sealed, dust-proof lids and thick thermal insulation jackets over cold water storage tanks.
  • Cut out dead-leg pipe segments back to the main flow line to eliminate stagnant water pockets.

GROUP 4: PSYCHOLOGICAL REQUIREMENTS

Hazard 18: Crowding and Space

Deficiencies & Diagnostic Indicators

  • Over-occupied rooms where tenant numbers breach statutory floor area and room volume allocation limits.
  • Mixed-gender room sharing faults where opposite-sex children aged 10 or older are forced to sleep in the same bedroom.
  • Compromised internal layout options where key living rooms are used as full-time bedrooms, blocking main access routes.

Remedial Safety Actions

  • Enforce maximum occupancy limits matching the formal floor plan measurements of the property.
  • Convert underused ground floor reception spaces into distinct, partitioned bedrooms to provide proper separation.

Hazard 19: Entry by Intruders

Deficiencies & Diagnostic Indicators

  • Flimsy external portals including thin hollow-core timber doors, rotten frames, or loose window lock plates.
  • Substandard locking hardware on ground level entries, lacking robust 5-lever mortice locks or multi-point locking mechanisms.
  • Poorly lit perimeter boundaries or dark access alleys that hide entry attempts from view.

Remedial Safety Actions

  • Replace flimsy entrance doors with 44mm solid timber doors or composite security sets.
  • Install PAS24-compliant multi-point locking rails or 5-lever mortice deadlocks onto frame plates.
  • Mount dawn-to-dusk LED security lights over rear and side entrance doors.

Hazard 20: Noise

Deficiencies & Diagnostic Indicators

  • Inadequate acoustic separation through shared party walls or uninsulated timber floors, letting neighbor noise transfer freely.
  • Mechanical rattle problems from loose wastewater lines, vibrating heating pipes, or un-isolated water booster pumps.
  • Substandard window glazing insulation properties facing busy public roads or commercial loading zones.

Remedial Safety Actions

  • Build independent acoustic stud linings insulated with high-density mineral wool acoustic batts.
  • Install rubber isolation mats and dampening hangers around water booster pumps and pipe brackets.
  • Upgrade standard perimeter glazing units to specialized acoustic laminate double glazing.

Hazard 21: Lighting and Obstructed Views

Deficiencies & Diagnostic Indicators

  • Substandard daylighting where main living rooms or bedrooms feature window glass footprints covering less than 10% of the room floor area.
  • Severe external view blockages where windows look directly onto close, high blank retaining walls that cut off natural light.
  • Artificial circuit failures in windowless interior hallways or bathrooms, leaving spaces completely dark.

Remedial Safety Actions

  • Cut wider structural wall openings to install larger window assemblies or light-reflective sun tunnels.
  • Coat close boundary walls with white high-reflectivity masonry paint to bounce daylight back inside.
  • Rewire dead lighting tracks and fit low-energy, long-life LED bulkhead fittings inside windowless rooms.

Happy & productive customers from all sectors

Saffron Housing Trust Reliance Housing Ltd Lichfield District Council Trusted Housing Tim Vice Ltd Department of Housing and Urban Development Tai Calon

Call Sales: 0161 515 1414

Do YOU want to become a super-efficient HHSRS surveyor, make more profit, and have more leisure time?

Fill in this form to find out how to get started with our mobile & desktop surveying software.

Send HHSRS Survey & Inspection Reports Directly On-site!

If you're a busy overworked HHSRS surveyor,
you really need this mobile inspection app!

However, if you are ready to order your first month at a reduced price of £25 + VAT fill in this other form instead.

Call us on 0161 515 1414 if you want a custom data collection system built for any asset management system such as MRI, Tribal, NEC, Keystone, Northgate, Concept Evolution, IBM Maximo, etc.

We won't send you spam. Unsubscribe at any time.

* You can read our Terms of Service using this link.

Surveying Software that works the same on ANY Device
For iPads, iPhones, iOS, Android, Browsers